2025-07-17
01 Pain Point Analysis: Training Dilemma in a Thousand-Person Factory
A automotive components manufacturer (¥2.7B annual output) faced triple challenges:
(Industrial engineers calculated: Each training shutdown caused ~¥230k/day in lost productivity)
Implemented heavy-duty rail-guided folding table system with industrial-optimized features:
Transformation Efficiency:
(Data verified by Deloitte audit)
"Folding systems transformed training from a cost center to a profit driver."
— Chen Hao, Plant Operations Director
Project triggered industry-wide changes:
Address
Tenghua West Road, Zone C, Lubao Park, Central Science,Lubao Town, Sanshui District, Foshan City, Guangdong Province
Tel
86-130-7677-9529